CL Free Water Systems
BBB Report


Operation of ALL CL Free Pool Systems Require less than 5 Minutes per Week

Operation of the CL Free system consists of performing weekly tests of the water’s copper ion level and pH. If more ionization is needed, simply push the ionization button on the control box up one level until your weekly test shows the copper level is stable at between .5 and .7 ppm. At that time, you should not have to make any further adjustments.

 

 

Copyright © ChlorineFreeUSA. All Rights Reserved.