|

CL Free Water Systems
BBB Report |

|
Operation of ALL CL Free Pool Systems Require less
than 5 Minutes per Week
Operation of the CL Free system consists of
performing weekly tests of the water’s copper ion level and pH. If
more ionization is needed, simply push the ionization button on the
control box up one level until your weekly test shows the copper
level is stable at between .5 and .7 ppm. At that time, you should
not have to make any further adjustments.
|
|